Factory License in Nalanda can be obtained by making an online application later than requisite documents to sustain the application. Prior to applying for Factory License the owner must ensure that he has complied with everything the formalities relating to the infrastructure and licensing in its premises. Issuance of Factory License is subject to the inspection made by the Inspector after the duly filed application form is submitted before the concerned authority.
![]()
We pay for extensive full package service similar to regard to Factory registration in Nalanda. We not only apply for factory license but we make certain the situation has whatever the valuable approvals and license required to take steps in that specific field.
Who are blamed to apply for Factory License?
Any factory wherein
- 10 or more workers are operating with aid of power; or
- 20 or more workers are enthusiastic without aid of power.
Is required to apply for Factory license.
Which establishments are excuded from the definition of factory?
A mine or a mobile unit belonging to the armed forces of the Union or a railway presidency shed, or a hotel, restaurant or eating place.
Criteria for defining any instigation as a factory:
(1) There must be a premises.
(2) There must be a manufacturing process which is physical carried upon or is suitably ordinarily carried on in any allowance of such a premises.
(3) There must be ten or more workers who are/were working in such a premises upon any day of the last 12 months where the said manufacturing process is carried upon with the aid of power. But where the manufacturing process is carried on without the aid of power, the required number of workers operating should be twenty or more.
What is the epoch required to purchase factory license in Nalanda?
The application made for the registrationof the factory since the State Government or Chief Inspector is to be official or rejected by the same within 3 months form the date of application.
If no correspondence is conventional for 3 months the the application shall be considered as self approved.
Information and Documents required to be submitted for applying for Factory License.
Application in prescribed format (Form -1)
- Plans in 3 copies, drawn to scale, showing the site of the factory and sudden surroundings augment adjacent building and further structure, roads, drains etc. The plan, elevation, side view and valuable cross section of the various building indicating anything relevant details relating to natural lighting, ventilation and means of escape in raid of fire. The take aim shall also comprehensibly indicate the slant of the reforest machinery, aisles and passage way.
- Brief bank account of manufacturing process and process flow chart of manufacturing process
- List of reforest and machinery
- List of raw materials
- Consent to Establish/ Consent to Operate from State Pollution Control Board
- Land papers of the factory/ Proof of ownership of land (Copy of registered sale deed, lease deed and rent agreement). In proceedings of lease success or rent agreement, consent of the owner of the land.
- Company related documents such as Memorandum and Article of Association/ List of Directors/ Board of Directors resolution approximately appointment of occupier/ Partnership Deed 9. In act of Government/ Government owned/undertaking factories, letter of agreement of occupier from the concerned Ministry
- NOC/License from concerned department/authority in prosecution of saw mills, peeling of wood logs factories, explosive factory, arms and ammunition factory, drug and pharmaceuticals factory, brick kilns and rock crusher
- For banned/ regulated items, permission from the respective Department is necessary.
- ID Proof of the applicant/authorized representative (Aadhaar Card/ PAN Card) 13. Any supplementary documents specifically requested by IF/Deputy IF/CIF.
For Factory License or Factor Act Registration in Nalanda.
Contact us at +91-8540078000, +91-8540085000, +91-8540099000
Email us at: info@meerad.in