Factory License in Shaksohra can be obtained by making an online application considering requisite documents to sustain the application. Prior to applying for Factory License the owner must ensure that he has complied with all the formalities relating to the infrastructure and licensing in its premises. Issuance of Factory License is subject to the inspection made by the Inspector after the duly filed application form is submitted back the concerned authority.
![]()
We have enough money extensive full package service in the same way as regard to Factory registration in Shaksohra. We not abandoned apply for factory license but we make clear the issue has all the valuable approvals and license required to conduct yourself in that specific field.
Who are answerable to apply for Factory License?
Any factory wherein
- 10 or more workers are in force with aid of power; or
- 20 or more workers are on the go without aid of power.
Is required to apply for Factory license.
Which establishments are excuded from the definition of factory?
A mine or a mobile unit belonging to the armed forces of the Union or a railway running shed, or a hotel, restaurant or eating place.
Criteria for defining any initiation as a factory:
(1) There must be a premises.
(2) There must be a manufacturing process which is swine carried on or is so ordinarily carried on in any allowance of such a premises.
(3) There must be ten or more workers who are/were practicing in such a premises upon any daylight of the last 12 months where the said manufacturing process is carried on with the aid of power. But where the manufacturing process is carried upon without the aid of power, the required number of workers keen should be twenty or more.
What is the times required to get your hands on factory license in Shaksohra?
The application made for the registrationof the factory back the State Government or Chief Inspector is to be credited or rejected by the similar within 3 months form the date of application.
If no correspondence is time-honored for 3 months the the application shall be considered as self approved.
Information and Documents required to be submitted for applying for Factory License.
Application in prescribed format (Form -1)
- Plans in 3 copies, drawn to scale, showing the site of the factory and rapid surroundings count up adjacent building and further structure, roads, drains etc. The plan, elevation, side view and critical cross section of the various building indicating whatever relevant details relating to natural lighting, ventilation and means of run off in battle of fire. The point shall also suitably indicate the incline of the forest machinery, aisles and passage way.
- Brief checking account of manufacturing process and process flow chart of manufacturing process
- List of reforest and machinery
- List of raw materials
- Consent to Establish/ Consent to Operate from State Pollution Control Board
- Land papers of the factory/ Proof of ownership of land (Copy of registered sale deed, lease talent and rent agreement). In warfare of lease capability or rent agreement, consent of the owner of the land.
- Company connected documents such as Memorandum and Article of Association/ List of Directors/ Board of Directors resolution roughly appointment of occupier/ Partnership Deed 9. In battle of Government/ Government owned/undertaking factories, letter of consent of occupier from the concerned Ministry
- NOC/License from concerned department/authority in battle of saying mills, peeling of wood logs factories, explosive factory, arms and ammunition factory, drug and pharmaceuticals factory, brick kilns and rock crusher
- For banned/ regulated items, permission from the respective Department is necessary.
- ID Proof of the applicant/authorized representative (Aadhaar Card/ PAN Card) 13. Any further documents specifically requested by IF/Deputy IF/CIF.
For Factory License or Factor Act Registration in Shaksohra.
Contact us at +91-8540078000, +91-8540085000, +91-8540099000
Email us at: info@meerad.in