INDUSTRIAL POLLUTION LICENSE CONSULTANT
Pollution License is required by every industry enthusiastic in manufacturing, storage, marketing, packaging and repackaging of goods whether or not for human or animal consumption having take in hand link once the outdoor environment. Pollution License in Jamui is issued in two steps, all the industries, units held responsible to get pollution clearance shall previously setting going on there units apply for Consent to confirm with the State pollution Department later only they shall be allowed to set stirring there unit, once the Consent to Establish is obtained and the unit has obtained dynamic condition then prior to production the unit must get your hands on Consent to Operate from the Pollution department in order to start its functioning, failing such he shall be held responsible for stifling penalty.
![]()
Consent to Establish:
This is the utterly first step in obtaining pollution clearance. The unit applying for CTE must pay commandeer amount upon challan depending on its investment in reforest and Machinery.
Following Documents are required to be submitted next the department for the ambition of obtaining CTE:
- KYC details of the Business and Authorized Person
- Land documents – Rent/Lease Deed, Tax Receipt, E savings account etc.
- Project balance containing detailed cost and extra details of the project.
- Location Map
- Plant lay out map
- Undertaking re distance of every other landmark from the unit
- Coy of Environmental Clearance.
All these documents are required to be filed electronically considering the concerned department along afterward appropriate challan and next a being copy of such documents is required to be submitted at the office.
In general cases Consent to Establish is issued by the d apartment within 15 days of making of application
Consent to Operate:
Once Consent to Establish is issued by the department, the Unit shall apply for Consent to Operate in order to carry upon its operations. CTO shall be issued lonely after a prior inspection and visit of the unit. CTO shall be issued by the department within a become old of 30 days.
Application for allow of CTO must be accompanied by afterward documents
- KYC of concern and Authorized Representative
- Copy of CTE or previous CTO
- Copy of Environmental Compliance Report
- Undertaking not far off from compliance of the conditions of CTO
All the documents should be self attested and occupy shall amount must be deposited by satisfactory means.