INDUSTRIAL POLLUTION LICENSE CONSULTANT
Pollution License is required by all industry working in manufacturing, storage, marketing, packaging and repackaging of goods whether or not for human or animal consumption having tackle link later the outdoor environment. Pollution License in Munger is issued in two steps, all the industries, units answerable to make a make a attainment of of pollution clearance shall before setting up there units apply for Consent to confirm with the State pollution Department later only they shall be allowed to set happening there unit, once the Consent to Establish is obtained and the unit has obtained involved condition later prior to production the unit must attain Consent to Operate from the Pollution department in order to Begin its functioning, failing such he shall be answerable for heavy penalty.
![]()
Consent to Establish:
This is the very first step in obtaining pollution clearance. The unit applying for CTE must pay invade amount upon challan depending on its investment in forest and Machinery.
Following Documents are required to be submitted subsequent to the department for the seek of obtaining CTE:
- KYC details of the Business and Authorized Person
- Land documents – Rent/Lease Deed, Tax Receipt, E explanation etc.
- Project tally containing detailed cost and supplementary details of the project.
- Location Map
- Plant lay out map
- Undertaking just about distance of alternating landmark from the unit
- Coy of Environmental Clearance.
All these documents are required to be filed electronically with the concerned department along afterward appropriate challan and subsequently a instinctive copy of such documents is required to be submitted at the office.
In general cases Consent to Establish is issued by the d apartment within 15 days of making of application
Consent to Operate:
Once Consent to Establish is issued by the department, the Unit shall apply for Consent to Operate in order to carry on its operations. CTO shall be issued abandoned after a prior inspection and visit of the unit. CTO shall be issued by the department within a epoch of 30 days.
Application for grant of CTO must be accompanied by later documents
- KYC of thing and Authorized Representative
- Copy of CTE or previous CTO
- Copy of Environmental Compliance Report
- Undertaking something like compliance of the conditions of CTO
All the documents should be self attested and capture shall amount must be deposited by up to standard means.