INDUSTRIAL POLLUTION LICENSE CONSULTANT
Pollution License is required by every industry in action in manufacturing, storage, marketing, packaging and repackaging of goods whether or not for human or animal consumption having speak to link taking into account the uncovered environment. Pollution License in Dhanbad is issued in two steps, all the industries, units answerable to purchase pollution clearance shall since setting happening there units apply for Consent to uphold with the State pollution Department then only they shall be allowed to set occurring there unit, once the Consent to Establish is obtained and the unit has obtained involved condition later prior to production the unit must make a get your hands on of Consent to Operate from the Pollution department in order to start its functioning, failing such he shall be liable for heavy penalty.
![]()
Consent to Establish:
This is the unquestionably first step in obtaining pollution clearance. The unit applying for CTE must pay invade amount upon challan depending on its investment in plant and Machinery.
Following Documents are required to be submitted past the department for the intention of obtaining CTE:
- KYC details of the Business and Authorized Person
- Land documents – Rent/Lease Deed, Tax Receipt, E description etc.
- Project story containing detailed cost and supplementary details of the project.
- Location Map
- Plant lay out map
- Undertaking re distance of vary landmark from the unit
- Coy of Environmental Clearance.
All these documents are required to be filed electronically considering the concerned department along next appropriate challan and next a creature copy of such documents is required to be submitted at the office.
In general cases Consent to Establish is issued by the d apartment within 15 days of making of application
Consent to Operate:
Once Consent to Establish is issued by the department, the Unit shall apply for Consent to Operate in order to carry upon its operations. CTO shall be issued forlorn after a prior inspection and visit of the unit. CTO shall be issued by the department within a times of 30 days.
Application for consent of CTO must be accompanied by in the same way as documents
- KYC of concern and Authorized Representative
- Copy of CTE or previous CTO
- Copy of Environmental Compliance Report
- Undertaking not in the distance off from compliance of the conditions of CTO
All the documents should be self attested and seize shall amount must be deposited by all right means.