INDUSTRIAL POLLUTION LICENSE CONSULTANT
Pollution License is required by all industry full of zip in manufacturing, storage, marketing, packaging and repackaging of goods whether or not for human or animal consumption having take in hand link when the uncovered environment. Pollution License in Patna City is issued in two steps, all the industries, units blamed to come by pollution clearance shall in the past setting going on there units apply for Consent to announce with the State pollution Department after that only they shall be allowed to set in the works there unit, once the Consent to Establish is obtained and the unit has obtained energetic condition later prior to production the unit must obtain Consent to Operate from the Pollution department in order to Begin its functioning, failing such he shall be held responsible for close penalty.
![]()
Consent to Establish:
This is the very first step in obtaining pollution clearance. The unit applying for CTE must pay take possession of amount upon challan depending on its investment in forest and Machinery.
Following Documents are required to be submitted later than the department for the ambition of obtaining CTE:
- KYC details of the Business and Authorized Person
- Land documents – Rent/Lease Deed, Tax Receipt, E credit etc.
- Project savings account containing detailed cost and further details of the project.
- Location Map
- Plant lay out map
- Undertaking not in the distance off from distance of swap landmark from the unit
- Coy of Environmental Clearance.
All these documents are required to be filed electronically in imitation of the concerned department along afterward appropriate challan and then a swine copy of such documents is required to be submitted at the office.
In general cases Consent to Establish is issued by the d apartment within 15 days of making of application
Consent to Operate:
Once Consent to Establish is issued by the department, the Unit shall apply for Consent to Operate in order to carry upon its operations. CTO shall be issued lonesome after a prior inspection and visit of the unit. CTO shall be issued by the department within a grow old of 30 days.
Application for consent of CTO must be accompanied by in the same way as documents
- KYC of concern and Authorized Representative
- Copy of CTE or previous CTO
- Copy of Environmental Compliance Report
- Undertaking not far and wide off from compliance of the conditions of CTO
All the documents should be self attested and invade shall amount must be deposited by up to standard means.