INDUSTRIAL POLLUTION LICENSE CONSULTANT
Pollution License is required by all industry lively in manufacturing, storage, marketing, packaging and repackaging of goods whether or not for human or animal consumption having take in hand link considering the outside environment. Pollution License in Beur Patna is issued in two steps, all the industries, units responsible to get pollution clearance shall previously setting up there units apply for Consent to confirm with the State pollution Department later only they shall be allowed to set going on there unit, once the Consent to Establish is obtained and the unit has obtained vigorous condition after that prior to production the unit must come by Consent to Operate from the Pollution department in order to Begin its functioning, failing such he shall be responsible for heavy penalty.
![]()
Consent to Establish:
This is the unconditionally first step in obtaining pollution clearance. The unit applying for CTE must pay capture amount on challan depending on its investment in reforest and Machinery.
Following Documents are required to be submitted as soon as the department for the seek of obtaining CTE:
- KYC details of the Business and Authorized Person
- Land documents – Rent/Lease Deed, Tax Receipt, E tab etc.
- Project tab containing detailed cost and new details of the project.
- Location Map
- Plant lay out map
- Undertaking in credit to distance of swap landmark from the unit
- Coy of Environmental Clearance.
All these documents are required to be filed electronically afterward the concerned department along when appropriate challan and subsequently a innate copy of such documents is required to be submitted at the office.
In general cases Consent to Establish is issued by the d apartment within 15 days of making of application
Consent to Operate:
Once Consent to Establish is issued by the department, the Unit shall apply for Consent to Operate in order to carry on its operations. CTO shall be issued only after a prior inspection and visit of the unit. CTO shall be issued by the department within a time of 30 days.
Application for attain of CTO must be accompanied by subsequently documents
- KYC of issue and Authorized Representative
- Copy of CTE or previous CTO
- Copy of Environmental Compliance Report
- Undertaking vis-а-vis compliance of the conditions of CTO
All the documents should be self attested and take over shall amount must be deposited by up to standard means.