INDUSTRIAL POLLUTION LICENSE CONSULTANT
Pollution License is required by all industry working in manufacturing, storage, marketing, packaging and repackaging of goods whether or not for human or animal consumption having deal with link like the external environment. Pollution License in Khelari is issued in two steps, all the industries, units liable to gain pollution clearance shall since setting occurring there units apply for Consent to uphold with the State pollution Department later only they shall be allowed to set happening there unit, once the Consent to Establish is obtained and the unit has obtained full of life condition subsequently prior to production the unit must get linkage of Consent to Operate from the Pollution department in order to Begin its functioning, failing such he shall be held responsible for heavy penalty.
![]()
Consent to Establish:
This is the enormously first step in obtaining pollution clearance. The unit applying for CTE must pay take over amount on challan depending on its investment in reforest and Machinery.
Following Documents are required to be submitted bearing in mind the department for the objective of obtaining CTE:
- KYC details of the Business and Authorized Person
- Land documents – Rent/Lease Deed, Tax Receipt, E bill etc.
- Project relation containing detailed cost and extra details of the project.
- Location Map
- Plant lay out map
- Undertaking roughly distance of stand-in landmark from the unit
- Coy of Environmental Clearance.
All these documents are required to be filed electronically when the concerned department along when appropriate challan and next a mammal copy of such documents is required to be submitted at the office.
In general cases Consent to Establish is issued by the d apartment within 15 days of making of application
Consent to Operate:
Once Consent to Establish is issued by the department, the Unit shall apply for Consent to Operate in order to carry on its operations. CTO shall be issued single-handedly after a prior inspection and visit of the unit. CTO shall be issued by the department within a period of 30 days.
Application for enter upon of CTO must be accompanied by in the same way as documents
- KYC of situation and Authorized Representative
- Copy of CTE or previous CTO
- Copy of Environmental Compliance Report
- Undertaking with mention to compliance of the conditions of CTO
All the documents should be self attested and take over shall amount must be deposited by all right means.