INDUSTRIAL POLLUTION LICENSE CONSULTANT
Pollution License is required by all industry on the go in manufacturing, storage, marketing, packaging and repackaging of goods whether or not for human or animal consumption having tackle link in the same way as the outdoor environment. Pollution License in Bakhtiyarpur is issued in two steps, all the industries, units responsible to get your hands on pollution clearance shall previously setting happening there units apply for Consent to insist with the State pollution Department later only they shall be allowed to set stirring there unit, once the Consent to Establish is obtained and the unit has obtained keen condition after that prior to production the unit must make a gain of Consent to Operate from the Pollution department in order to Begin its functioning, failing such he shall be held responsible for heavy penalty.
![]()
Consent to Establish:
This is the entirely first step in obtaining pollution clearance. The unit applying for CTE must pay occupy amount upon challan depending on its investment in reforest and Machinery.
Following Documents are required to be submitted behind the department for the seek of obtaining CTE:
- KYC details of the Business and Authorized Person
- Land documents – Rent/Lease Deed, Tax Receipt, E tally etc.
- Project balance containing detailed cost and extra details of the project.
- Location Map
- Plant lay out map
- Undertaking in savings account to distance of substitute landmark from the unit
- Coy of Environmental Clearance.
All these documents are required to be filed electronically in the same way as the concerned department along taking into consideration appropriate challan and next a innate copy of such documents is required to be submitted at the office.
In general cases Consent to Establish is issued by the d apartment within 15 days of making of application
Consent to Operate:
Once Consent to Establish is issued by the department, the Unit shall apply for Consent to Operate in order to carry on its operations. CTO shall be issued isolated after a prior inspection and visit of the unit. CTO shall be issued by the department within a mature of 30 days.
Application for assent of CTO must be accompanied by gone documents
- KYC of thing and Authorized Representative
- Copy of CTE or previous CTO
- Copy of Environmental Compliance Report
- Undertaking with mention to compliance of the conditions of CTO
All the documents should be self attested and take possession of shall amount must be deposited by okay means.