INDUSTRIAL POLLUTION LICENSE CONSULTANT
Pollution License is required by every industry enthusiastic in manufacturing, storage, marketing, packaging and repackaging of goods whether or not for human or animal consumption having take in hand link subsequently the outdoor environment. Pollution License in Punpun is issued in two steps, all the industries, units blamed to come by pollution clearance shall before setting going on there units apply for Consent to support with the State pollution Department next only they shall be allowed to set happening there unit, once the Consent to Establish is obtained and the unit has obtained practicing condition later prior to production the unit must gain Consent to Operate from the Pollution department in order to start its functioning, failing such he shall be responsible for stifling penalty.
![]()
Consent to Establish:
This is the definitely first step in obtaining pollution clearance. The unit applying for CTE must pay seize amount upon challan depending on its investment in plant and Machinery.
Following Documents are required to be submitted taking into consideration the department for the intend of obtaining CTE:
- KYC details of the Business and Authorized Person
- Land documents – Rent/Lease Deed, Tax Receipt, E story etc.
- Project explanation containing detailed cost and additional details of the project.
- Location Map
- Plant lay out map
- Undertaking regarding distance of substitute landmark from the unit
- Coy of Environmental Clearance.
All these documents are required to be filed electronically gone the concerned department along like appropriate challan and subsequently a innate copy of such documents is required to be submitted at the office.
In general cases Consent to Establish is issued by the d apartment within 15 days of making of application
Consent to Operate:
Once Consent to Establish is issued by the department, the Unit shall apply for Consent to Operate in order to carry on its operations. CTO shall be issued unaided after a prior inspection and visit of the unit. CTO shall be issued by the department within a epoch of 30 days.
Application for comply of CTO must be accompanied by like documents
- KYC of concern and Authorized Representative
- Copy of CTE or previous CTO
- Copy of Environmental Compliance Report
- Undertaking in this area compliance of the conditions of CTO
All the documents should be self attested and take over shall amount must be deposited by adequate means.