INDUSTRIAL POLLUTION LICENSE CONSULTANT
Pollution License is required by every industry operating in manufacturing, storage, marketing, packaging and repackaging of goods whether or not for human or animal consumption having take up link behind the outdoor environment. Pollution License in Akilpur is issued in two steps, all the industries, units held responsible to obtain pollution clearance shall previously setting occurring there units apply for Consent to sustain with the State pollution Department after that only they shall be allowed to set occurring there unit, once the Consent to Establish is obtained and the unit has obtained functional condition then prior to production the unit must gain Consent to Operate from the Pollution department in order to Begin its functioning, failing such he shall be answerable for close penalty.
![]()
Consent to Establish:
This is the entirely first step in obtaining pollution clearance. The unit applying for CTE must pay take over amount upon challan depending on its investment in plant and Machinery.
Following Documents are required to be submitted taking into consideration the department for the intention of obtaining CTE:
- KYC details of the Business and Authorized Person
- Land documents – Rent/Lease Deed, Tax Receipt, E description etc.
- Project relation containing detailed cost and additional details of the project.
- Location Map
- Plant lay out map
- Undertaking in this area distance of swap landmark from the unit
- Coy of Environmental Clearance.
All these documents are required to be filed electronically gone the concerned department along next appropriate challan and then a monster copy of such documents is required to be submitted at the office.
In general cases Consent to Establish is issued by the d apartment within 15 days of making of application
Consent to Operate:
Once Consent to Establish is issued by the department, the Unit shall apply for Consent to Operate in order to carry on its operations. CTO shall be issued lonely after a prior inspection and visit of the unit. CTO shall be issued by the department within a get older of 30 days.
Application for consent of CTO must be accompanied by taking into consideration documents
- KYC of event and Authorized Representative
- Copy of CTE or previous CTO
- Copy of Environmental Compliance Report
- Undertaking nearly compliance of the conditions of CTO
All the documents should be self attested and take control of shall amount must be deposited by welcome means.