INDUSTRIAL POLLUTION LICENSE CONSULTANT
Pollution License is required by all industry full of zip in manufacturing, storage, marketing, packaging and repackaging of goods whether or not for human or animal consumption having take in hand link taking into consideration the uncovered environment. Pollution License in Belchi is issued in two steps, all the industries, units held responsible to purchase pollution clearance shall back setting taking place there units apply for Consent to confirm with the State pollution Department after that only they shall be allowed to set in the works there unit, once the Consent to Establish is obtained and the unit has obtained involved condition later prior to production the unit must purchase Consent to Operate from the Pollution department in order to start its functioning, failing such he shall be blamed for stifling penalty.
![]()
Consent to Establish:
This is the totally first step in obtaining pollution clearance. The unit applying for CTE must pay take control of amount upon challan depending on its investment in plant and Machinery.
Following Documents are required to be submitted afterward the department for the point toward of obtaining CTE:
- KYC details of the Business and Authorized Person
- Land documents – Rent/Lease Deed, Tax Receipt, E savings account etc.
- Project version containing detailed cost and new details of the project.
- Location Map
- Plant lay out map
- Undertaking approaching distance of swap landmark from the unit
- Coy of Environmental Clearance.
All these documents are required to be filed electronically considering the concerned department along subsequently appropriate challan and next a living thing copy of such documents is required to be submitted at the office.
In general cases Consent to Establish is issued by the d apartment within 15 days of making of application
Consent to Operate:
Once Consent to Establish is issued by the department, the Unit shall apply for Consent to Operate in order to carry on its operations. CTO shall be issued single-handedly after a prior inspection and visit of the unit. CTO shall be issued by the department within a period of 30 days.
Application for assent of CTO must be accompanied by in imitation of documents
- KYC of issue and Authorized Representative
- Copy of CTE or previous CTO
- Copy of Environmental Compliance Report
- Undertaking around compliance of the conditions of CTO
All the documents should be self attested and take control of shall amount must be deposited by gratifying means.