INDUSTRIAL POLLUTION LICENSE CONSULTANT
Pollution License is required by all industry working in manufacturing, storage, marketing, packaging and repackaging of goods whether or not for human or animal consumption having deliver link next the outside environment. Pollution License in Lower Bazaar is issued in two steps, all the industries, units liable to get union of pollution clearance shall in the past setting happening there units apply for Consent to encourage with the State pollution Department then only they shall be allowed to set occurring there unit, once the Consent to Establish is obtained and the unit has obtained full of zip condition later prior to production the unit must make a attain of Consent to Operate from the Pollution department in order to start its functioning, failing such he shall be responsible for stuffy penalty.
![]()
Consent to Establish:
This is the certainly first step in obtaining pollution clearance. The unit applying for CTE must pay appropriate amount on challan depending on its investment in reforest and Machinery.
Following Documents are required to be submitted next the department for the intention of obtaining CTE:
- KYC details of the Business and Authorized Person
- Land documents – Rent/Lease Deed, Tax Receipt, E report etc.
- Project tally containing detailed cost and new details of the project.
- Location Map
- Plant lay out map
- Undertaking roughly distance of substitute landmark from the unit
- Coy of Environmental Clearance.
All these documents are required to be filed electronically next the concerned department along in the appearance of appropriate challan and after that a physical copy of such documents is required to be submitted at the office.
In general cases Consent to Establish is issued by the d apartment within 15 days of making of application
Consent to Operate:
Once Consent to Establish is issued by the department, the Unit shall apply for Consent to Operate in order to carry on its operations. CTO shall be issued lonely after a prior inspection and visit of the unit. CTO shall be issued by the department within a era of 30 days.
Application for assent of CTO must be accompanied by subsequent to documents
- KYC of matter and Authorized Representative
- Copy of CTE or previous CTO
- Copy of Environmental Compliance Report
- Undertaking on the subject of compliance of the conditions of CTO
All the documents should be self attested and invade shall amount must be deposited by up to standard means.