INDUSTRIAL POLLUTION LICENSE CONSULTANT
Pollution License is required by every industry committed in manufacturing, storage, marketing, packaging and repackaging of goods whether or not for human or animal consumption having take up link gone the outside environment. Pollution License in Pitwas is issued in two steps, all the industries, units held responsible to make a attain of pollution clearance shall back setting going on there units apply for Consent to verify with the State pollution Department then only they shall be allowed to set going on there unit, once the Consent to Establish is obtained and the unit has obtained effective condition later prior to production the unit must buy Consent to Operate from the Pollution department in order to start its functioning, failing such he shall be blamed for stuffy penalty.
![]()
Consent to Establish:
This is the very first step in obtaining pollution clearance. The unit applying for CTE must pay capture amount on challan depending upon its investment in plant and Machinery.
Following Documents are required to be submitted similar to the department for the take aim of obtaining CTE:
- KYC details of the Business and Authorized Person
- Land documents – Rent/Lease Deed, Tax Receipt, E tab etc.
- Project bill containing detailed cost and further details of the project.
- Location Map
- Plant lay out map
- Undertaking not far afield off from distance of exchange landmark from the unit
- Coy of Environmental Clearance.
All these documents are required to be filed electronically like the concerned department along bearing in mind appropriate challan and later a monster copy of such documents is required to be submitted at the office.
In general cases Consent to Establish is issued by the d apartment within 15 days of making of application
Consent to Operate:
Once Consent to Establish is issued by the department, the Unit shall apply for Consent to Operate in order to carry on its operations. CTO shall be issued unaccompanied after a prior inspection and visit of the unit. CTO shall be issued by the department within a grow old of 30 days.
Application for consent of CTO must be accompanied by later documents
- KYC of situation and Authorized Representative
- Copy of CTE or previous CTO
- Copy of Environmental Compliance Report
- Undertaking going around for compliance of the conditions of CTO
All the documents should be self attested and commandeer shall amount must be deposited by normal means.