INDUSTRIAL POLLUTION LICENSE CONSULTANT
Pollution License is required by all industry lively in manufacturing, storage, marketing, packaging and repackaging of goods whether or not for human or animal consumption having lecture to link later than the outside environment. Pollution License in Rajeev Nagar is issued in two steps, all the industries, units blamed to get pollution clearance shall in the past setting stirring there units apply for Consent to pronounce with the State pollution Department later only they shall be allowed to set in the works there unit, once the Consent to Establish is obtained and the unit has obtained vigorous condition subsequently prior to production the unit must get grip of Consent to Operate from the Pollution department in order to start its functioning, failing such he shall be responsible for unventilated penalty.
![]()
Consent to Establish:
This is the very first step in obtaining pollution clearance. The unit applying for CTE must pay take control of amount on challan depending on its investment in reforest and Machinery.
Following Documents are required to be submitted in imitation of the department for the ambition of obtaining CTE:
- KYC details of the Business and Authorized Person
- Land documents – Rent/Lease Deed, Tax Receipt, E description etc.
- Project version containing detailed cost and further details of the project.
- Location Map
- Plant lay out map
- Undertaking roughly distance of substitute landmark from the unit
- Coy of Environmental Clearance.
All these documents are required to be filed electronically considering the concerned department along in the proclaim of appropriate challan and subsequently a physical copy of such documents is required to be submitted at the office.
In general cases Consent to Establish is issued by the d apartment within 15 days of making of application
Consent to Operate:
Once Consent to Establish is issued by the department, the Unit shall apply for Consent to Operate in order to carry on its operations. CTO shall be issued solitary after a prior inspection and visit of the unit. CTO shall be issued by the department within a epoch of 30 days.
Application for succeed to of CTO must be accompanied by like documents
- KYC of situation and Authorized Representative
- Copy of CTE or previous CTO
- Copy of Environmental Compliance Report
- Undertaking approximately compliance of the conditions of CTO
All the documents should be self attested and occupy shall amount must be deposited by tolerable means.