INDUSTRIAL POLLUTION LICENSE CONSULTANT
Pollution License is required by every industry involved in manufacturing, storage, marketing, packaging and repackaging of goods whether or not for human or animal consumption having concentrate on link subsequently the outdoor environment. Pollution License in Nalanda is issued in two steps, all the industries, units answerable to obtain pollution clearance shall in the past setting happening there units apply for Consent to uphold with the State pollution Department subsequently only they shall be allowed to set stirring there unit, once the Consent to Establish is obtained and the unit has obtained dynamic condition next prior to production the unit must gain Consent to Operate from the Pollution department in order to start its functioning, failing such he shall be responsible for stifling penalty.
![]()
Consent to Establish:
This is the completely first step in obtaining pollution clearance. The unit applying for CTE must pay seize amount on challan depending upon its investment in forest and Machinery.
Following Documents are required to be submitted in the make public of the department for the set sights on of obtaining CTE:
- KYC details of the Business and Authorized Person
- Land documents – Rent/Lease Deed, Tax Receipt, E balance etc.
- Project bill containing detailed cost and extra details of the project.
- Location Map
- Plant lay out map
- Undertaking approaching distance of rotate landmark from the unit
- Coy of Environmental Clearance.
All these documents are required to be filed electronically similar to the concerned department along following appropriate challan and later a physical copy of such documents is required to be submitted at the office.
In general cases Consent to Establish is issued by the d apartment within 15 days of making of application
Consent to Operate:
Once Consent to Establish is issued by the department, the Unit shall apply for Consent to Operate in order to carry on its operations. CTO shall be issued abandoned after a prior inspection and visit of the unit. CTO shall be issued by the department within a period of 30 days.
Application for comply of CTO must be accompanied by subsequent to documents
- KYC of thing and Authorized Representative
- Copy of CTE or previous CTO
- Copy of Environmental Compliance Report
- Undertaking all but compliance of the conditions of CTO
All the documents should be self attested and take possession of shall amount must be deposited by okay means.