INDUSTRIAL POLLUTION LICENSE CONSULTANT
Pollution License is required by every industry enthusiastic in manufacturing, storage, marketing, packaging and repackaging of goods whether or not for human or animal consumption having concentrate on link later than the uncovered environment. Pollution License in Rajendra Nagar is issued in two steps, all the industries, units responsible to get bond of pollution clearance shall before setting going on there units apply for Consent to acknowledge with the State pollution Department then only they shall be allowed to set up there unit, once the Consent to Establish is obtained and the unit has obtained vigorous condition then prior to production the unit must gain Consent to Operate from the Pollution department in order to start its functioning, failing such he shall be responsible for stuffy penalty.
![]()
Consent to Establish:
This is the unquestionably first step in obtaining pollution clearance. The unit applying for CTE must pay occupy amount on challan depending on its investment in tree-plant and Machinery.
Following Documents are required to be submitted later than the department for the intention of obtaining CTE:
- KYC details of the Business and Authorized Person
- Land documents – Rent/Lease Deed, Tax Receipt, E balance etc.
- Project checking account containing detailed cost and other details of the project.
- Location Map
- Plant lay out map
- Undertaking as regards distance of alternating landmark from the unit
- Coy of Environmental Clearance.
All these documents are required to be filed electronically gone the concerned department along in the same way as appropriate challan and next a subconscious copy of such documents is required to be submitted at the office.
In general cases Consent to Establish is issued by the d apartment within 15 days of making of application
Consent to Operate:
Once Consent to Establish is issued by the department, the Unit shall apply for Consent to Operate in order to carry upon its operations. CTO shall be issued unaccompanied after a prior inspection and visit of the unit. CTO shall be issued by the department within a mature of 30 days.
Application for enter upon of CTO must be accompanied by considering documents
- KYC of concern and Authorized Representative
- Copy of CTE or previous CTO
- Copy of Environmental Compliance Report
- Undertaking approximately compliance of the conditions of CTO
All the documents should be self attested and commandeer shall amount must be deposited by usual means.