INDUSTRIAL POLLUTION LICENSE CONSULTANT
Pollution License is required by every industry energetic in manufacturing, storage, marketing, packaging and repackaging of goods whether or not for human or animal consumption having forward link behind the outside environment. Pollution License in Rohtas is issued in two steps, all the industries, units liable to come by pollution clearance shall in the past setting in the works there units apply for Consent to verify with the State pollution Department after that only they shall be allowed to set going on there unit, once the Consent to Establish is obtained and the unit has obtained practicing condition then prior to production the unit must get Consent to Operate from the Pollution department in order to Begin its functioning, failing such he shall be blamed for oppressive penalty.
![]()
Consent to Establish:
This is the categorically first step in obtaining pollution clearance. The unit applying for CTE must pay occupy amount upon challan depending upon its investment in tree-plant and Machinery.
Following Documents are required to be submitted in imitation of the department for the wish of obtaining CTE:
- KYC details of the Business and Authorized Person
- Land documents – Rent/Lease Deed, Tax Receipt, E checking account etc.
- Project version containing detailed cost and supplementary details of the project.
- Location Map
- Plant lay out map
- Undertaking around distance of exchange landmark from the unit
- Coy of Environmental Clearance.
All these documents are required to be filed electronically with the concerned department along once appropriate challan and next a beast copy of such documents is required to be submitted at the office.
In general cases Consent to Establish is issued by the d apartment within 15 days of making of application
Consent to Operate:
Once Consent to Establish is issued by the department, the Unit shall apply for Consent to Operate in order to carry upon its operations. CTO shall be issued single-handedly after a prior inspection and visit of the unit. CTO shall be issued by the department within a mature of 30 days.
Application for consent of CTO must be accompanied by with documents
- KYC of concern and Authorized Representative
- Copy of CTE or previous CTO
- Copy of Environmental Compliance Report
- Undertaking concerning compliance of the conditions of CTO
All the documents should be self attested and take control of shall amount must be deposited by tolerable means.